Treatment of Digestate

Titel Replacement of an existing membrane plant treating effluent from a biogas plant in Thallwitz
Kunde Ökotec Anlagenbau GmbH
Beauftragung 2009
Beschreibung Ökotec Anlagenbau GmbH operates a biogas plant to utilize organic waste. The installed effluent treatment technology has not been reliable and has experienced severe glitches in past years. A3 Water Solutions GmbH received the order to replace the existing submerged ultrafiltration hollow fiber membrane modules with A3’s proven membrane technology.

 

Titel Expansion of an existing membrane plant treating fermentation residue from a biogas plant in Inwil / Switzerland
Kunde CTU
Beauftragung 2009
Beschreibung The biogas plant owned by Swiss Farmer Power AG in Inwil / Switzerland is already equipped with an A3 Water Solutions GmbH effluent treating membrane plant. In order to increase the reverse osmosis (RO) effluent concentration, an additional RO stage was installed.

 

Titel Supply of a treatment plant for process water (fermentation residue) generated by a biogas plant in Winsum, Netherlands
Kunde Vermue
Beauftragung 2008
Beschreibung Vermue operates a treatment plant handling fermentation residue in Winsum, NL. Included in a renovation of the existing biogas plant was the construction of a facility to treat the generated process water for direct discharge into a stream. The plant’s input consists mostly of liquid manure (corn, cattle), food left over and grass silage

 

Titel Supply of a treatment plant for process water (fermentation residue) generated by the biogas plant in Inwil
Kunde CTU
Beauftragung 2007
Beschreibung CTU - Conzepte Technik Umwelt AG - builds a biogas plant for Swiss Farmer Power AG in Inwil, Switzerland. The plant’s input consists mostly of liquid manure and organic waste from agriculture. Since the process water from the fermentation process contains high concentrations of solids, ammonium, additional nutrients and salts, an on-site treatment process is require before the water can be discharged to the public sewer system. A3 Water Solutions GmbH provides a process water treatment plant for fermentation residue including solid/liquid separation and membrane stages.

 

Titel Construction of a clean water production plant for the 'Klarsee' Bioenergy Park in Penkun
Kunde NAWARO Engineering GmbH, Leipzig
Beauftragung 2006
Beschreibung NAWARO Engineering GmbH, a project company of BioEnergie AG located in Leipzig, is erecting the „Klarsee“ Bioenergy Park in Penkun. All of the 40 individual digesters of the Bioenergy Park are scheduled to go onstream by fall 2007. This will make the installation the currently biggest biogas power plant worldwide having a total electric power output of 20 megawatts. The arising digestion products (approx. 408,000 t/a) are pelletized in an associated fertilizer plant to produce depot fertilizers. The liquid discharged from the fertilizer production process is treated in a vacuum evaporation unit where separation into a water and a concentrate stream takes place. The condensate arising from the evaporation process (approx. 280,000 t/a) contains large amounts of ammonium nitrogen, hardness-forming substances as well as other nutrient salts and is therefore treated in an A3 reverse osmosis plant to obtain clean water which is again fed to the biodigesters or to some extent disposed of via the discharge system.

 

Titel Construction of a treatment plant for digestion residues from the Brensbach biogas facility
Kunde Biogas Brensbach GmbH
Beauftragung 2006
Beschreibung Hese-Umwelt builds a biogas plant (BGP) for Bio Energietechnik GmbH Brensbach. The BGP is fed with meal leftovers and packaged food. Excess water from digestion contains solids, ammonium nitrogen and salts of high concentration so that digestion residues must be subjected to treatment before the liquid phase can be disposed of via the discharge system. A3 Water Solutions GmbH has been commissioned by the Plant Owner to build a treatment plant for the all the digestion residues arising. Biowert GmbH Brensbach is producing insulating material based on grass and grass silage material. Production results in the discharge of wastewater which contains solids, organic substances and ammonium nitrogen and is used for biogas production. The treated, clean water coming from the digestion residues treatment plant is used by Biowert GmbH as service water for production purposes.

 

Titel Construction of a treatment plant for digestion residues from the Lüneburg biogas facility
Kunde Hese Umwelt GmbH
Beauftragung 2006
Beschreibung HESE-Umwelt sets up a biogas plant (BGP) for the city of Lüneburg. Primarily, the BGP is fed with meal leftovers and packaged food. Excess water from digestion contains solids, ammonium nitrogen and salts of high concentration so that digestion residues must be subjected to treatment before the liquid phase can be disposed of via the discharge system. A3 Water Solutions GmbH plans and builds the multi-stage digestion residues treatment plant comprising the process segments solid-liquid separation, ultrafiltration and reverse osmosis.

 

Titel Treatment of fermentation remnants from a biogas plant to achieve direct discharger quality
Kunde Diefenthal-Biogas GmbH
Beauftragung 2005
Beschreibung BGA Diefenthal primarily processes food leftovers. Since the agricultural utilization of fermentation remnants from food leftover plants will no longer be permissible in future a treatment process had to be provided. For this purpose A3 Water Solutions GmbH was commissioned to plan and construct a treatment plant for fer-mentation remnants. The plant comprises a solids/liquid separation via decanter as well as an ultra-filtration and reverse-osmosis stage. The solids thus produced are composted. The treated water to be disposed of satisfies all requirements specified to enable it to be directly discharged into adjacent streams.

 

Wastewater Treatment

Titel Expansion of a containerized membrane bioreactor for the wastewater treatment of the military camp in Kunduz / Afghanistan
Kunde EFA Hochbau GmbH
Beauftragung 2010
Beschreibung An A3 Water Solutions’ GmbH containerized membrane plant has been in operation at the military camp in Kunduz / Afghanistan for the past years. Due to a steady increase of camp personnel, a plant capacity expansion of the existing plant from 450 to 1.350 soldiers was required. An additional containerized membrane bioreactor identical to the previous plant (double stack) was added to the existing plant.

 

Titel Containerized MBR plant for a military camp
Kunde Norwegian Army
Beauftragung 2008
Beschreibung Purchase of an A3 containerized MBR plant for the Norwegian Army that operates in a military camp in Meymaneh, Afghanistan. The plant effluent is reused locally to minimize external water consumption.

 

Titel Delivery of a MBR plant for the treatment of process water
Kunde ESAROM Essenzenfabrik Ges.m.b.H.
Beauftragung 2008
Beschreibung ESAROM located in Oberrohrbach, Austria, is in the process of upgrading an existing wastewater treatment facility for their proc-ess water. The MBR plant was chosen based on the limited space that is available for the treatment facility and a planned increase in future production capacity.

 

Titel Containerized MBR plant for the treatment of wastewater generated by food industry
Kunde Triqua B.V.
Beauftragung 2008
Beschreibung Triqua constructs a MBR wastewater treatment plant for wastewater generated by the food industry. A3 Water Solutions GmbH manufactures the membrane stage (container equipped with membrane modules installed with multi-module guide rail systems).

 

 

Titel Enlargement of a membrane plant to treat process water generated by the textile industry
Kunde Pongs, Mühltroff
Beauftragung 2008
Beschreibung Seidenweberei Pongs GmbH operates a textile process plant in Mühltroff, Germany. The generated daily washing water from dyeing and other processes to treat cotton and synthetic fabrics is characterized by a high content in COD and BOD5. The process water is currently treated in an A3 membrane bioreactor (MBR). MaxFlow Microfiltration modules separate the sludge from the treated effluent. An expansion of the production has increased the daily process water amount. A3 Water Solutions GmbH was contracted to expand the current MBR plant.

 

 

 

Titel Supply of membrane modules for the MBR plant in the Challenger Cruise ships 3 and 4
Kunde Krüger Wabag GmbH
Beauftragung 2008
Beschreibung The shipyard Meyer Papenburg constructed two additional Challenger cruise ships that are equipped with A3 MBR technology. Each MBR plant has capacity for 4,000 people with a combined surface area of 9,800 m².

 

 

Titel MBR plant for a cooking oil production facility
Kunde Nijhuis Water Technology
Beauftragung 2008
Beschreibung Nijhuis Water Technology designed and is currently building a MBR plant for the treatment of wastewater produced by a cooking oil production plant. A3 Water Solutions GmbH received the order to provide membrane modules for this wastewater treatment plant.

 

Titel Pilot plant for marine wastewater treatment according to new IMO- regulations
Kunde Krüger Wabag GmbH
Beauftragung 2007
Beschreibung New IMO-regulations require an in depth examination of wastewater treatment plants on ships to meet stricter effluent guidelines. MBR technology is essentially required to meet the new standard. A pilot plant has been manufactured for certification purposes. A3 Water Solutions GmbH provided MaxFlow membrane modules for the treatment plant.

 

Titel Replacement of a conventional plant equipped with a trickling filter
Kunde A3-USA, LLC
Beauftragung 2007
Beschreibung A3-USA, which is based in Pittsburgh, PA, received the order to provide a MBR plant for the community in Millheim, USA. The plant will replace an existing conventional treatment plant that is equipped with a trickling filter. A3 Water Solutions GmbH was involved in the basic design and provides MaxFlow membrane modules and other equipment for this project.

 

Titel Extension of a containerized MBR plant for the wastewater treatment for the military camp in Mazar-e-Sharif / Afghanistan
Kunde Federal Office of Defense, Technology and Procurement
Beauftragung 2007
Beschreibung The existing A3 MBR plant is expanded from a current capacity of 1,500 to 2,500 soldiers. The plant is pre-assembled and wired in 20’ shipping containers. A3 Water Solutions GmbH will also be responsible for the operation on site.

 

Titel Retrofit of containerized test pilot plants into MBR plants
Kunde Vito
Beauftragung 2007
Beschreibung The two containers of a conventional wastewater treatment plant are retrofitted to a Membrane Bioreactor pilot plant. Membrane modules from various manufactures will be used. The container is equipped with extensive monitoring equipment to document the treatment process.

 

Titel Construction of a nanofiltration and reverse osmosis plant for an automobile industry supplier
Kunde i+f process
Beauftragung 2007
Beschreibung Wastewater Treatment equipment including nanofiltration and reverse osmosis membranes for I + F Process GmbH who is supplying a process water treatment facility for an automobile industry supplier.

 

Titel Planning and Installation of a containerized plant for wastewater treatment in military camps
Kunde Dutch Army
Beauftragung 2007
Beschreibung The wastewater in military camp of the Dutch Army in Tarin Kowt (Afghanistan) was collected and treated with a conventional activated sludge process. The effluent quality of this plant was insufficient and the capacity was to low. To become more and more autonomous, the Dutch Army ordered a mobile containerized wastewater treatment plant which the sewage is operated by MBR technology. The filtrate of the plant could be disposed directly.

 

Titel Construction of a nanofiltration and reverse osmosis for surface coating supplier
Kunde i+f process
Beauftragung 2007
Beschreibung Water treatment equipment including nanofiltration and reverse osmosis membranes for I+F Process GmbH who is supplying a dipping bath plant for surface waters.

 

Titel Delivery of filtration modules for the sewage water treatment on bord of cruise liners (Celebrity Solstice, Challenger-class)
Kunde Krüger Wabag GmbH
Beauftragung 2006
Beschreibung The Meyer Papenburg shipyard builds actually two new cruise liners with MBR technology for sewage water treatment. Each ship has a capacity of more than 4,000 people. Two additional ships are under order. A3 was selected for delivery of 144 membrane modules of M 70 002 type with 10,080 m² membrane surface in total.

 

Titel Construction of an anaerobic reactor for the purification of wastewater arising in the food processing industries
Kunde Milk-Snack Produktions GmbH
Beauftragung 2006
Beschreibung The existing anaerobic wastewater pretreatment plant operated by Milk-Snack Produktions GmbH is appropriately modified and expanded to satisfy prescribed future needs. The following modification and expansion measures will be implemented: Supply, erection and commissioning of a 4th UASB reactor, integration of the new UASB reactor into the wastewater system, supply, erection and commissioning of an additional hydrolysis vessel including the required internals as well as pertinent NaOH dosing unit for pH value stabilizing, reconstruction of the existing 1st and 2nd UASB reactors based on the 3rd reactor while operation continues, supply, erection and integration of a caustic solution storage and dosing station, construction of a gas treatment plant for the desulfurization of biogas produced by the overall plant, supply, erection and commissioning of an additional heating boiler installation for utilization of the produced biogas, construction of an HT biogas bleeder for incineration of the excess biogas, supply, installation and integration of the instrumentation equipment into the existing PLC/PCS system.

 

Titel Robust ultrafiltration plant for the treatment of oxidation and soap baths used in vat dying processes
Kunde Kettelhack GmbH & Co. KG
Beauftragung 2006
Beschreibung In the framework of the Piwatex projects supported by BMBF the company of A3 Water Solutions GmbH in cooperation with Wuppertal University has developed a process for the treatment of the oxidation and soap bath of the pad-steam plant. Investigation results have shown that the process is well suited for integration into the production activities. Through bath treatment the service life of the baths increases substantially. Moreover, production plant cleaning periods and downtimes are significantly brought down and energy cost for hot water generation can be saved as well. The ultrafiltration unit linked with the pad-steam plant eliminates the vat dyestuffs and COD constituents contained in the liquid so that the resulting filtrate enhances the oxidation and soap bath characteristics on a permanent basis.

 

Titel Combined potable water, effluent and sludge treatment plant, of containerized construction, in Siberia
Kunde Engineering Dobersek GmbH
Beauftragung 2006
Beschreibung Engineering Dobersek GmbH has a project for the installation of a potable water treatment and effluent purification plant including sludge treatment to be located in Siberia. After the treatment the municipal wastewater is discharged into fishing water. The installation operates according to the membrane bioreactor technology with submerged MaxFlow membrane modules. All plant units are arranged in insulated and heated containers.

 

Titel Planning, construction and supply of a membrane bioreactor of containerized design for treatment of wastewater arising in the Mazar-e-Sharif encampment in Afghanistan
Kunde Bundesamt für Wehrtechnik und Beschaffung
Beauftragung 2006
Beschreibung Design, construction and supply of a complete container plant for the treatment of wastewater produced in the encampment of German Federal Armed Forces in Mazar-e-Sharif / Afghanistan. Construction of the plant is realized in two steps. Initially, the plant is designed to clean the effluent produced by 1,500 soldiers such that the discharge can either be reused or disposed of by direct percolation. The plant has been designed for modular expansion in steps of 500 p.e. up to a total of 3,000 p.e.. Aside from supplying the plant the company of A3 has also been contracted to provide operation services on site.

 

Titel Planning and Installation of a containerized plant for wastewater treatment in the military camp in Kunduz
Kunde EFA Hochbau GmbH
Beauftragung 2005
Beschreibung Design, construction and supply of a complete 20‘ container plant for the treatment of wastewater produced in the encampment of German Federal Armed Forces in Kunduz / Afghanistan. To improve the injection of atmospheric oxygen into the biological treatment section and make optimum use of the available space the plant has been designed as a double-deck container. The equipment is capable of appropriately treating the arising wastewater such that it can be directly disposed of locally by soakaway/percolation.

 

Titel Supply of membrane modules for the MBR plant on board of a Mega-Yacht
Kunde VA TECH Wabag GmbH
Beauftragung 2005
Beschreibung VA TECH Wabag has the order to build a MEMROD wastewater treatment plant on board of a luxury Mega-Yacht. A3 Water Solutions GmbH delivers the MaxFlow Membrane Modules for the assignment.

 

Titel Bilge water treatment aboard bilge water/oil separating vessels
Kunde Bilgenentölungsgesellschaft mbH
Beauftragung 2005
Beschreibung Bilge water arising in inland waterways vessels is collected by bilge water/oil separating vessels while normal ship operation continues. These vessels treat the oil-water mixture and discharge the cleaned water phase into the water. The oil is collected and disposed of via onshore systems. To satisfy requirements specified in Annex 27 of the Effluent Ordinance governing the discharge of water novel process technology had to be developed. A3 Water Solutions GmbH was commissioned to develop and implement this technical solution.

 

Titel Municipal wastewater treatment using containerized MBR technology
Kunde Linksniederrheinisch Entwässerungs-Genossenschaft LINEG
Beauftragung 2005
Beschreibung The Xanten-Vynen effluent treatment plant had to be extended in terms of capacity. The additional effluent volume of a population equivalent of 2,000 is cleaned by means of containerized MBR technology in 2 double-deck 40’ container modules. The innovative, compact design enables oxygen to be introduced into the biological system most effectively through deep injection with minimum space requirements. The containers are completely manufactured in the factory and shipped to the site ready to be hooked up. In this way construction and commissioning times are considerably shortened, no civil /excavation work is required and the system can go onstream without delay.

 

Titel Construction and supply of a postaeration tank with connection to a biofilter for the food industry
Kunde Nadler Feinkost GmbH
Beauftragung 2004
Beschreibung To enable more stringent discharge requirements to be met the existing effluent treatment plant of the company of Nadler was supplemented by a post-aeration tank. The waste air from post-aeration is kept odorless with the help of a biofilter.

 

Titel Delivery of MaxFlow Membrane Modules for Corvettes K130
Kunde Wabag Wassertechnik GmbH
Beauftragung 2004
Beschreibung Federal Office of Defense and Procurement builds a new generation of corvettes for the German Navy. Five ships are built in the first construction phase. A3 Water Solutions GmbH has been commissioned to construct and supply the microfiltration membrane modules for the wastewater treatment system on board of theses ships.

 

 

 

 

 

Titel Reconstruction of the F 123 Brandenburg frigate
Kunde Neue Jadewerft GmbH
Beauftragung 2004
Beschreibung In the course of farreaching F 123 frigate reconstruction work the on-board effluent treatment facilities, inter alia, are optimized. In the framework of this project A3 Water Solutions GmbH provides technical assistance throughout the reconstruction work, commissions the effluent treatment facilities and trains operating personnel.

 

Titel Planning and installation of a pilot plant for testing of submerged ceramic membrane modules
Kunde ItN Modulkonzept GmbH
Beauftragung 2004
Beschreibung Planning and installation of a mobile pilot plant for testing of ceramic plate membrane modules in different wastewater.

 

Titel Planning and installation of a MBR plant for cleaning textile wastewater
Kunde Textile Industry
Beauftragung 2003
Beschreibung The wastewater with a high amount of size from cotton and Trevira-CS textiles is treated in an on-site sewage plant. Because of using the submerged microfiltration unit, the wastewater could be reused.

 

Titel Planning and Installation of a containerized plant for wastewater treatment in military camps
Kunde Federal Office of Defense and Procurement, Germany
Beauftragung 2003
Beschreibung The wastewater in military camps of the German Federal Armed Forces (grey and black water) was collected and disposed by local companies. To become more and more autonomous, the Federal Office of Defense and Procurement ordered a mobile containerized wastewater treatment plant which the sewage is operated by MBR technology. The filtrate of the plant could be disposed directly.

 

Titel Process optimization and recirculation of wastewater in the textile industry with robust ultrafiltration
Kunde Federal Ministry of Education and Research (BMB+F)
Beauftragung 2003
Beschreibung Planning and installation of a robust ultrafiltration unit for treating wastewater out of oxidation and soap baths to separate vat dye. The treated water will be reused. Because of the treatment, there is an enormous economizing in energy and basic materials.

 

Titel Running a MBR pilot plant for treatment of compost leachate
Kunde Composting plant
Beauftragung 2003
Beschreibung The leachate of the composting plant is collected in a tank and transported via truck to disposal. The MBR technology should replace this expensive disposal. The filtrate of the MBR unit has a high quality and is sanitary clean. Therefore it could be reused e.g. as industrial water.

 

Titel Planning of a mixing and equalizing tank
Kunde HESE-Umwelt GmbH
Beauftragung 2003
Beschreibung Planning of a mixing and equalizing tank with a volume of 150 m³. The collected wastewater will be used for flue gas neutralization.

 

Titel Planning and installation of a MRB for treatment and recirculation of wasterwater from fish farms
Kunde Federal Environmental Agency, Germany
Beauftragung 2003
Beschreibung Treatment of wastewater from fish farms with MBR for reusing. Due to the high quality of the filtrate, a complete generation of fishs should grow without any water exchange.

 

Titel Feasibility study for modification of the wastewater treatment system on the naval service ships FD 423 of the German Navy
Kunde Federal Office of Defense and Procurement, Germany
Beauftragung 2003
Beschreibung The existing wastewater treatment plants on board of the naval service ships FD 423 are not up to date. In the feasibility study it was checked to replace the existing plants with a MBR in combination with a vacuum unit.

 

Titel Delivery of 60 MaxFlow membrane modules for the wastewater treatment plant on board of the aircraft carrier „Andrea Doria“
Kunde VA TECH WABAG, Germany
Beauftragung 2003
Beschreibung The aircraft carrier “Andrea Doria” is built by the Italian Navy. The carrier has a crew capacity of 1,100 people. The A3 Water Solutions GmbH was assigned to deliver 60 MaxFlow microfiltration modules for the wastewater treatment plant.

 

Titel Planning, installation and operation of a pilot plant for sewage treatment with new microfiltration modules
Kunde MUN-LV NRW and University of Bochum
Beauftragung 2003
Beschreibung Over the period of 3 years, in this research project the economic operation of a MBR with a new membrane module is tested. In a plant with 2 sections, the sewage of approx. 1,300 people with 640 m² installed membrane area is treated. The filtrate could be discharged in compliance with the EU-Directive for bathing water.

 

Titel Installation of a MAP-Pilot plant
Kunde Federal Environmental Agency, Germany
Beauftragung 2002
Beschreibung Magnesium-Ammonium-Phosphate (MAP) could be used for the elimination of nitrogen. With this pilot plant the economical production of the longterm fertilizer MAP from sewage will be demonstrated. The recycling of the botanical nutrients nitrogen and phosphorous in a transportable condition shows the potential of this trend-setting technology.

 

Titel Feasibility study for modifacation of the wastewater treatment system on the figates F 122 of the German Navy
Kunde Federal Office of Defense and Procurement, Germany
Beauftragung 2002
Beschreibung The existing wastewater treatment plants on board of the naval service ships F 122 are not up to date. In this feasibility study it was checked to replace the existing plants with a MBR and to show the economical retrofitting of the given systems.

 

Titel Planning and installation of a plant for treatment of textile wastewater
Kunde Dr. Wessling Beratende Ingenieure/Textil- und Bekleidungsver-band Nord-West
Beauftragung 2002
Beschreibung In this project, called PIWATEX, a containerized treatment plant for textile wastewater is planned and installed. The system is based on MBR and the filtrate is reused as process water.

 

Titel Planning and installation of a MBR plant for cleaning textile wastewater
Kunde Textile industry
Beauftragung 2001
Beschreibung The wastewater with a high amount of size is already treated in a plant and is transported to a nearby sewage plant. Because of the retrofitting with microfiltration modules, the wastewater could be discharged directly into an on-site tank preflooder.

 

Titel Installation and operation of a remote monitoring system for the “SSS Gorch Fock” (German Navy)
Kunde Federal Office of Defense and Procurement, Germany
Beauftragung 2001
Beschreibung Together with ITENOS GmbH, a sub-company of the Dt. Telekom, the sewage plant of the SSS Gorch Fock of the German Navy was equipped with a bi-directional remote monitoring system. The system used INMARSAT B and the master control station at A3 Water Solutions GmbH.

 

Titel Development and testing of a new treatment technology plant for fermental waste from agricultural and industrial biogas plants
Kunde Hese Umwelt GmbH
Beauftragung 2001
Beschreibung The project deals with development and testing of treatment for fermental waste from of agricultural and industrial biogas plants. This new technology combines the processes of ultrafiltration, Magnesium-Ammonium-Phosphate (MAP) precipitation, MBR and reverse osmosis. The recycling of the botanical nutrients nitrogen and phosphorous in a transportable condition shows the potential of this trend-setting technology.

 

Titel Retrofitting of a mixing and equalizing tank
Kunde Textile industry
Beauftragung 2001
Beschreibung An open mixing and equalizing tank in the textile industry was closed and aerated to avoid exhalation emissions and to prevent sulfate corrosion. Further more a biofilter was installed.

 

Titel Developing and testing of a new “low cost” membrane module
Kunde Hese Umwelt GmbH
Beauftragung 2001
Beschreibung A new membrane module for wastewater and freshwater treatment was developed. After testing the module in different applications, a series production line will be established.

 

Titel Planning and installation of a wastewater treatment plant on the “SSS Gorch Fock” (German Navy)
Kunde VA TECH WABAG, Germany
Beauftragung 2000
Beschreibung Planning, installation and commissioning of a new wastewater treatment plant by MBR on the SSS Gorch Fock was made by A3 Water Solutions GmbH.

 

Titel Installation and commissioning of two wastewater treatment plants on ships
Kunde VA TECH WABAG, Germany
Beauftragung 2000
Beschreibung Two MBR plants in the MEMROD project for wastewater treatment on ships were installed and commissioned.

 

Titel Planning to optimize an industrial wastewater treatment plant and installation of a precipitation unit
Kunde Zweckverband Wasser/Abwasser Vogtland ZWAV
Beauftragung 2000
Beschreibung An optimization for a wastewater treatment plant in the cosmetics industry was planned. In the future, a MBR and a precipitation unit will implement into the system. As a first step, the three-stage pre-cipitation unit was installed.

 

Water Treatment

Titel Design support of a power plant extension
Kunde E.ON Engineering GmbH
Beauftragung 2007
Beschreibung Among current E.ON projects is the extension of the existing De-sal-water treatment facility for a brown coal power plant. The capacity of the existing boiler is to be extended to 110 t/h. A3 Water Solutions GmbH was commissioned to conduct an initial evaluation and to provide design fundamentals.

 

Titel Combined potable water, wastewater and sludge treatment plant, of containerized construction, in Siberia
Kunde Engineering Dobersek GmbH
Beauftragung 2006
Beschreibung Engineering Dobersek GmbH has a project for the installation of a potable water treatment and effluent purification plant including sludge treatment to be located in Siberia. After the treatment the municipal wastewater is discharged into fishing water. The installation operates according to the membrane bioreactor technology with submerged MaxFlow membrane modules. All plant units are arranged in insulated and heated containers.

 

Titel Underground cooling water treatment
Kunde Deutsche Steinkohle AG
Beauftragung 2005
Beschreibung The Auguste Viktoria coal mine requires large cooling water volumes. Hitherto, cooling water was taken from the potable water network. Making now use of a newly set up heat exchanger system an internal circuit is formed enabling significant potable water volumes to be saved and, moreover, pumps and equipment to be effectively protected against corrosion.

 

Titel Planning, construction and supply of a softening plant
Kunde Frings GmbH
Beauftragung 2005
Beschreibung With a view to obtaining boiler feedwater a recycling plant was designed for the treatment of process water from animal food production. To warrant the desired boiler feedwater quality a softening plant has been integrated into the system. This softening plant comprises an ion exchange unit and has been designed as a dual train system with individual valves. The capacity of the ion exchange unit is 40 m3/h.

 

Titel Planning and construction of a softening and demineralization plant for the production of boiler feedwater
Kunde Abfallbehandlungszentrum Hannover
Beauftragung 2005
Beschreibung Planning and construction of a multi-stage treatment plant for boiler feedwater consisting of activated carbon filter, ion exchanger and reverse osmosis unit.